FIRM'S BLISS is another land mark property including construction of Stilt plus three floors 6 Premium Residential two & three bed room apartments with modern amenities. The building will be constructed at Plot New.No.12/3, Old.No.4, Plot No.7, Jayammal Street, Shenoy Nagar, Chennai-600030.
STRUCTURE
R.C.C framed structure with Brick walls plastered with anti crack fibres and finished with Two Coats of Cement based Emulsion Putty, with one coat of primer and two coats of Plastic Emulsion. Ceilings will be plastered and finished with Two Coats of Cement based Emulsion Putty, with one coat of primer and two coats of Plastic Emulsion.
JOINERY
All door frames, window frames, window shutters and the main door shutters are kiln seasoned to reduce moisture level.
a. Main door: First Quality Burma Teak both frame and shutters (Panel door) Polished both sides with melamine spray.
b. Other doors: will be deep-moulded compressed wood fibre raised panel doors, strengthened with pre-selected kiln dried rails and stiles, with a grain effect etched in the panel with first quality teak frames, both polished with melamine spray. All door frames will be teak frames. Toilet doors will be painted FRP doors
c. Windows: All windows will be teak wood windows polished from inside and painted outside with glass panels (pinhead glass) and Bright Bar grills.
FLOORING
Vitrified Tiles 900mm X 900mm (Rs.80/- per Sq.ft) plain colours with 4” high skirting for the whole flat.
KITCHEN
Polished Black galaxy granite slab over cooking platform, Franke/Nirali/ equivalent Stainless steel sink/ equivalent with drain board and plain glazed tiles (10” x 14”) upto 2’ height above the platform.
TOILETS
Plain ceramic tile flooring, ceramic printed/ plain tile dado, for about 7’0” height from floor, concealed plumbing arrangements.
SANITARYWARES & FIXTURES
Parryware Cascade NXT wall mounted model White closets provided in all bathrooms. Half turn foam flow taps and fittings MARC Oriental Series or Equivalent for all toilets. Three in one wall mixture will be provided in attached toilet and two in one wall mixture in the common toilet.
ELECTRICAL
Three phase electric supply connection with a separate Manual Three phase changeover switches inside each flat and wiring will be of copper fire retardant cables concealed in PVC conduits. MINIATURE CIRCUIT BREAKERS & RCCB (Residual Current Circuit Breaker) will be provided and switches will be Modular Type mounted on metal boxes. In all bedrooms, provision for A/C points will be done. TV and Telephone points will be provided in Living and all bedrooms.
CHEMICAL EARTHING
Done for the building by digging 3m deep bores inserted with hot dipped galvanized dual pipes, filled with high conductive and corrosion resistant crystalline mixture and backfill compound around the electrodes.
WATER SUPPLY
Corporation and borewell water supply in the kitchen, service and bathrooms.
LIFT
A FIVE Passenger LIFTwill be provided, with VVVF and Auto Rescue Device.
GENERATOR
40 KVA standby Generator with alternator, sound proof enclosure, control panel, change over panel and earthing etc.,will be provided.
ORNAMENTAL CORNER MOULDS
will be fitted at Living room ceiling corner areas.
SPECIAL AMENITIES
Special amenities as per individual requirement at extra cost.
FLOOR | FLAT | AREA ( IN SQ. FEET) | AVAILABILITY |
---|---|---|---|
First Floor | Flat No.1 | 1725 | |
First Floor | Flat No.2 | 1040 | |
Second Floor | Flat No.1 | 1725 | |
Second Floor | Flat No.2 | 1040 | |
Third Floor | Flat No.1 | 1725 | |
Third Floor | Flat No.2 | 1040 |
PAYMENT SCHEDULE | |
---|---|
At the time of BOOKING | Land cost + Regis Charge + 30% of Construction cost |
On completion of BASEMENT | 10% of Construction cost + Corpus |
On completion of GROUND FLOOR ROOF | 10% of Construction cost |
On completion of FIRST FLOOR ROOF | 10% of Construction cost |
On completion of SECOND FLOOR ROOF | 10% of Construction cost |
On completion of THIRD FLOOR ROOF | 10% of Construction cost |
On completion of BRICK WORK of your flat | 7% of Construction cost |
On completion of INTERNAL PLASTERING of your flat | 5% of Construction cost |
On completion of TILE LAYING of your flat | 5% of Construction cost |
On HANDING OVER POSSESSION | 3% of Construction cost |
Q-BLOCK, NO.93, 4th MAIN ROAD,
ANNA NAGAR, CHENNAI – 40.
044 2619 2619 ( 4 Lines )
+91 99400 22619 / +91 97909 22619